海港工程浚后测量的实施  被引量:1

Implementation of Harbor Dredging Engineering Surveys

在线阅读下载全文

作  者:宁林春 方荣华 黄辰虎[2] 王玉春 

机构地区:[1]91650部队,广东广州510320 [2]海军海洋测绘研究所,天津300061

出  处:《海洋测绘》2017年第2期39-41,50,共4页Hydrographic Surveying and Charting

摘  要:疏浚工程测量比例尺大,精度要求高,但规范较少。通过比较国标、行业规定对疏浚工程测量的技术要求,认为疏浚工程测量中要抓好技术设计、外业测量、数据处理、质量评定4个关键环节。外业数据采集阶段需要抓住水位控制、测量定位、深度测量、质量控制这4个重点方向,以获得可靠的测量数据信息,满足工程测量的高精度数据要求,提交高质量的测量成果资料。Through the comparison between the international standard requirement and the industry regulation requirement for dredging engineering technology,it is thought that the dredging engineering survey needs to grasp four key points of technology design,field survey,data processing and quality evaluation,and the field data collecting stage needs to focus on four key directions,including water level control,survey positioning,depth measuring and quality control etc. ,in order to get the reliable survey data information,meet the requirement of the engineering survey for high-accuracy data and submit the high-quality survey achievement material.

关 键 词:工程测量 海港工程 疏浚 数据采集 质量控制 

分 类 号:P229.3[天文地球—大地测量学与测量工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象