检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:尹建娜
机构地区:[1]中核核电运行管理有限公司,浙江海盐314300
出 处:《中国核电》2017年第1期39-45,共7页China Nuclear Power
摘 要:重水堆核电厂自运行以来,装卸料机B推杆多次出现位置失效现象,导致换料中断、换料计划调整、甚至在通道关闭时装卸料机料仓超压而引起重水泄漏等情况。文章针对B推杆位置失效原因展开分析,重点分析了波纹管、减速器、机械计数器和电位计等B推杆的主要部件,就上述部件失效原因提出改进措施,从而大大减少位置失效现象。Since pressurized heavy water reactor (PHWR) put into operation, fueling machine ram B hadexperienced failure for many times, which further cause fueling inter ruption, schedule change, even overpressure of fueling machine and D2O leaking when the channel s closed. These article analyses the root cause of ram B fai lure,with emphasis on main components of bellow, speed reducer ,mechanical counter,and potentiometer. Regarding the failure cause, improvement measures are put forward in this article, and thus position failure is reduced significantly.
分 类 号:TM623.4[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.164.105