检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:国志鹏
出 处:《水利建设与管理》2017年第2期80-83,共4页Water Conservancy Construction and Management
摘 要:以浑河沈阳浑南段为研究对象,对该河段泥沙淤积规律进行分析,并对橡胶坝工程运行进行模拟。结果表明:河右侧弯道处泥沙沉积量较小,右侧回水区域泥沙沉积量较大,建设橡胶坝后的泥沙沉积量相比天然条件下要小得多,最大沉积量不超过0.03m;因此,需要适当设置橡胶坝,确保其有效阻挡泥沙,降低其对河岸的冲刷。该研究对合理规划、建设和运行橡胶坝有参考价值。Hunhe River Shenyang Hunnan section is regarded as a research object for analyzing the law of fiver sediment deposition in the river section and simulating the operation of rubber dam project. The results show that sediment deposition is smaller in the bend on the right side of the river. The sediment deposition is larger in the backwater area on the left side, the sediment deposition after construction of rubber dam is much smaller than that under natural condition. The maximum deposition is not more than 0. 03m. Thereby, rubber dam should be installed suitably for ensuring effective blockage of silt and lowering its scouting on the river bank. The research has reference value for the rational plan, construction and operation of rubber dam.
分 类 号:TV149[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249