检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:安百富[1,2] 齐文跃[3] 兰立信 梅贤丞 周泽[4] 唐湘隆 AN Bai-fu QI Wen-yue LAN Li-xin MEI Xian-cheng ZHOU Ze TANG Xiang-long(Work Safety Key Lab on Prevention and Control of Gas and Roof Disasters for Southern Coal Mines ,Hunan University of Science and Technology,Xiangtan 411201, China Hnaan Provincial Key Laboratory of Safe Mining Techniques of Coal Mines, Hunan University of Science and Technology, Xiangtan 411201 ,China School of Mines,China University of Mining and Technology,Xuzhou 221116,China School of Resource,Environment and Safety Engi- neering ,Hunan University of Science and Technology,Xiangtan 411201, China)
机构地区:[1]湖南科技大学南方煤矿瓦斯与顶板灾害预防控制安全生产重点实验室,湖南湘潭411201 [2]湖南科技大学煤矿安全开采技术湖南省重点实验室,湖南湘潭411201 [3]中国矿业大学矿业工程学院,江苏徐州221116 [4]湖南科技大学资源环境与安全工程学院,湖南湘潭411201
出 处:《煤炭学报》2017年第2期397-403,共7页Journal of China Coal Society
基 金:国家重点基础研究发展计划(973)资助项目(2013CB227905);国家自然科学基金创新研究群体资助项目(51421003)
摘 要:为分析覆岩-煤柱群回收前的稳定性,采用数值模拟软件Flac3D分析了煤柱蠕变期间塑性区发育及内部应力分布形式的演化特征,发现:蠕变过程分为快速变形、缓慢变形及加速失稳3个阶段,并总结出了不同阶段塑性区发育和内部应力分布形式的对应关系;在分析覆岩和煤柱相互作用的基础上,建立了弹性地基薄板模型,推导出了顶板变形、煤柱受力与煤柱塑性区发育范围之间的计算方程组,揭示了覆岩-煤柱群减弱至失稳的动态变化特征;给出了覆岩-煤柱群体系失稳临界时间节点判据和方法,并结合工程算例进行了分析。Stress and displacement field of roof and standing pillars( RSP) are always in a state of flux,its stability should be studied before recovering the standing pillars. The creep process of coal pillars is analyzed by Flac3 D. The process could be divided into three stages: rapid deformation,slow deformation and accelerating failure. Also,the laws of plastic zone and inner stress distribution pattern of coal pillars at different stages are obtained. Based on the theoretical analysis,one thin plate on elastic found model is established to analyze the relationship between the roof deformation,the force on the pillars and the ranges of plastic zones of coal pillars,and the proposed model allows to reveal the dynamic evolution of the decreasing-failure process of RSP. Furthermore,a criterion for evaluating the critical failure time of RSP is then given in this study,which is illustrated through an engineering case.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15