浅埋深大采高综采工作面矿压显现规律分析  被引量:7

Deep Shallow Buried Large Mining Height Broken Mine Pressure Firstly Analysis of Fully-mechanized Working Face

在线阅读下载全文

作  者:谭宝[1] 

机构地区:[1]山西焦煤集团西山煤电集团公司屯兰矿,山西太原030206

出  处:《煤》2017年第3期7-9,共3页Coal

基  金:内蒙古科技大学创新基金(31253027)

摘  要:以常胜煤矿浅埋深大采高一次采全高综采工作面为背景,通过现场矿压监测,得出了这种条件下工作面的矿压规律,结果表明:工作面中部来压时的平均压力要大于两端头;来压期间支架活柱不但没有下沉,反而会出现一定的增量;85201工作面初次来压步距为75 m,周期来压平均步距23 m,来压期间矿压显现强烈;支架工作阻力总体符合正态分布,能够满足工作面控制工作面顶板的要求。为本矿区其它矿井安全开采提供借鉴。To winning coal mine deep shallow buried large mining height are broken once mining overall height of fully mechanized working face as the background,through the mine pressure monitoring,it is concluded that this kind of working face under the condition of the mine pressure regularity and the results show that the central face to pressure the average pressure is greater than two end;Instead of a support column during sinking,but there will be a certain increment; 85201 face first pressure step distance is 75 m,23 m,periodic weighting average interval of mine pressure appear during strong; The overall rate of the support working resistance conforms to normal distribution,can satisfy the working face roof control requirements. Serve as a reference for the other mining security.

关 键 词:浅埋深 大采高 矿压显现 

分 类 号:TD323[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象