检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘铸[1] 赵大军[1] LIU Zhu ZHAO Da-jun(Construction Engineering College of Jilin University, Changchun 130012,China)
出 处:《中小企业管理与科技》2017年第8期74-75,共2页Management & Technology of SME
摘 要:新扩建6层裙房工程,拟建在原有人防地下室上面,在不拆除原有人防地下室的情况下,对原有构筑物桩基、地板下地基进行挤密灌浆,使原有构筑物桩基和地基承载力提高3倍,满足新扩建6层裙房承载力要求。The expansion of 6 storey podium engineering, which is expected to be built on the original civil air defense basement.Under the condition of without removing the existing civil air defense basement, compaction grouting is carded out on the pile foundation and floor of the original structure to increase the pile foundation and foundation beating capacity of the original building by 3 times,and meet the new requirements of beating capacity expansion of 6 storey podium.
关 键 词:挤密灌浆法(CGS工法) 增层改造 地基加固补强
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.21.55.224