110kV线路零序过流保护误动作原因分析  被引量:3

Cause Analysis of Zero-Sequence Overcurrent Protection Malfunctioning on 110kV Line

在线阅读下载全文

作  者:韩海英[1] 王永胜[1] 刘涛[1] 李慧勇[1] 

机构地区:[1]乌兰察布电业局,内蒙古乌兰察布012000

出  处:《内蒙古电力技术》2017年第1期88-91,共4页Inner Mongolia Electric Power

摘  要:某220kV变电站110kV线路零序过流保护误动,分析其原因为:该线路间隔L3相电流互感器接线盒入口处破皮,造成二次回路两点接地,同时系统发生接地故障,最终导致该线路零序过流保护误动。针对以上原因,从基建改造、日常维护、设备巡视等方面提出整改措施。Analyzed the causes of a 110 kV line zero-sequence protection maltunctioning in the 220 kV substation. The cable was broken at the entrance of junction box on the line bays of the L3 phase current transformer, resulted in the two-point grounding on the secondary circuits, and a ground fault in the primary system occured, which eventually led to the zero-sequence overcurrent protection malfunctioning. Thus, put forwad corresponding rectification in measures from capital construction and transformation, daily maintenance,and equipment patrol.

关 键 词:零序过流保护 误动 二次回路 零电位接地网 两点接地 

分 类 号:TM773[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象