检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄锦新
机构地区:[1]龙滩水电开发有限公司龙滩水力发电厂,广西天峨547300
出 处:《水力发电》2017年第4期38-40,50,共4页Water Power
摘 要:针对龙滩水电站10 kV厂用电原综合保护测控装置电子元器件老化严重、自动化水平低、人机界面和软件不够友好、维护工作困难等问题,为提高厂用电系统供电的可靠性,龙滩水电站对10 kV厂用电保护装置进行了全新改造。新综合保护装置的应用,保护功能全面、操作界面友好、运维方便,提高了龙滩水电厂厂用电可靠运行,保障了电厂运行安全、稳定。In order to improve the reliability of power supply system in the auxiliary power of Longtan Hydropower Station, the protection devices of 10 kV auxiliary power in Longtan Hydropower Station are transformed for solving the operation problems of original integrated protection and control devices, including serious electronic component aging, low automation level, non- friendly man-machine interface and software, and difficult maintenance. The application of new comprehensive protection devices which have comprehensive protection function, friendly interface and convenient operation and maintenance has improved the operation reliability of auxiliary power and guaranteed the safety and stability of station operation.
分 类 号:TV642.2[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30