检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:农普裕
机构地区:[1]龙滩水电开发有限公司龙滩水力发电厂,广西天峨547300
出 处:《水力发电》2017年第4期82-84,共3页Water Power
摘 要:龙滩水电站大坝坝轴线采用折线形,共布设两套激光准直系统。因建设期种种原因,系统未能按相关规范要求设置工作基点,监测成果并不理想,未能充分发挥激光准直系统高精度的优越性。为此,提出在廊道内19号和20号、20号和21号坝段之间的横缝处各安装一支双向测缝计,将19号坝段的垂线坐标数据引至21号坝段;静力水准从32号坝段引向21号坝段、11号坝段引向5号坝段的改造、校核方案。建议与两套真空激光准直系统主体更换改造项目一起实施,从而提高费用效益比。Two sets of laser collimation system are arranged in Longtan Hydropower Station to monitor the broken-line axis of dam, but the system fails to set measuring base points according to relevant specifications during construction period. The monitoring results are not satisfied and the advantages of high precision laser alignment system are failed to be fully play. The proposed transformation scheme includes that, (a) two two-way seam measuring devices will be installed in the horizontal joints of corridor between 19^th and 20^th monolith and 20^th and 21 ^st monolith respectively, and the vertical coordinate data in 19^th monolith will be transferred to 21^st monolith; (b) two static level systems will be transferred from 32^nd monolith to 21^st monolith and 1 l'h monolith to 5th monolith respectively. In order to save cost, the transformation of measuring base points is proposed to be carrying out with the replacements of two vacuum laser collimation systems.
分 类 号:TV698.11[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33