检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王雄[1] 张碧琴[1] 黄富斌 党林航 WANG Xiong ZHANG Bi-qin HUANG Fu-bin DANG Lin-hang(School of Highway, Chang'an University, Xi'an 710064, Shaanxi, China Guangxi Communications Planning Surveying and Designing Institute Co. , Ltd. , Nanning 530029, Guangxi, China '~ 714NIMC~TTAK3q'f3NTC~-I T P~o~ ~:~ ~~)
机构地区:[1]长安大学公路学院,陕西西安710064 [2]广西交通规划勘察设计研究院有限公司,广西南宁530029 [3]中交通力建设股份有限公司,陕西西安710075
出 处:《筑路机械与施工机械化》2017年第4期84-88,共5页Road Machinery & Construction Mechanization
基 金:广西科技攻关与新产品试制项目(桂科技10124006-10);陕西省自然科学基金(2015JQ4104)
摘 要:为了研究施工区上游过渡段的行车风险,保障施工区的行车安全,应用Vissim仿真软件模拟施工区交通流的运行状态,分析过渡段长度、交通量、行驶速度对施工区行车风险的影响;利用冲突率作为评价指标,将路段行车风险分为5个等级,运用模糊综合评判理论进行综合评判。研究结果表明:过渡段长度、交通量是影响施工区上游过渡段行车风险最主要的因素,影响程度超90%,因而合理控制过渡段长度和交通量对降低施工区行车风险具有重要作用。In order to study the driving risk of the upstream transition section of the construction area and to ensure the traffic safety of the construction area, the Vissim simulation software was used to simulate the operation status of the traffic flow in the construction area, and the influence of the transition section length, traffic volume and driving speed on the driving risk was analyzed. Using the conflict rate as the evaluation index, the road traffic risk was divided into five grades, and the fuzzy comprehensive evaluation theory was applied to conduct a comprehensive evaluation. The results show that the length of the transition section and the traffic volume are the most important factors influencing the traffic risk of the transitional section in the upstream of the construction area. The influence degree is over 90%. Therefore, it is important to control the length of the transition area and the traffic volume to reduce the traffic risk.
分 类 号:U412.366[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229