立洲水电站导流隧洞下闸预案浅析  

Diversion Tunnel Gate Closing Plan at Hydropower Station

在线阅读下载全文

作  者:王强[1] 

机构地区:[1]中国水利水电第七工程局有限公司第一分局,四川彭山620860

出  处:《四川水力发电》2017年第2期17-19,共3页Sichuan Hydropower

摘  要:导流隧洞作为水利水电工程建设过程中的一项临时建筑工程,在工程挡水、取水口建筑物具备运行条件后一般均需进行永久封堵封闭。而导流隧洞封堵工作的前期准备及封堵的质量、进度及安全均会对后续工程及水利水电工程的按时及安全运行带来直接影响。浅析了导流隧洞封堵前的施工准备工作及施工中的注意事项,可为类似工程提供参考。During construction of water resources and hydropower projects,diversion tunnels are temporary construction works and often are permanently plugged and closed after retaining works and intake works are ready for operations.However,early preparations for diversion tunnel plugging,plugging quality,progress and safety will directly influence safe operations of successive projects and water resources and hydropower projects.In this paper,construction preparations before diversion tunnel closed and cautions in construction are analyzed,providing references for similar projects.

关 键 词:导流隧洞 下闸 封堵施工 研究应用 立洲水电站 

分 类 号:TV551.12[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象