机构地区:[1]北京全路通信信号研究设计院集团有限公司,北京100070
出 处:《铁路通信信号工程技术》2017年第2期108-111,共4页Railway Signalling & Communication Engineering
摘 要:高寒地区高速铁路客运专线建设,要实现运营设备品质优良、工期进度得以保证、最大限度的节约项目成本,供货阶段的管理和控制是重中之重。拟运用关键路径法理论,结合影响进度、工期的各种因素,制定高寒高铁客专供货管理计划关键路径,通过对其分析,找到影响进度制约工期的主要问题,进行风险防范、集中处理、有效应对。During construction of passenger dedicated lines, the management and control of the project in the supply phase are the key parts to ensure the high quality of operating equipment, project progress on schedule and maximum saving of project cost. The paper introduces using critical path method to make the supply management plan for construction of the passenger dedicated line in extremely cold area combined with all factors affecting the progress and project, points out the main issues affecting the progress and restricting the construction period, in order to implement risk prevention, centralized processing and effective response.
分 类 号:U238[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249