检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]潞安集团古城煤矿建设管理处,山西长治046100
出 处:《山东煤炭科技》2017年第4期37-39,42,48,共5页Shandong Coal Science and Technology
摘 要:基于综放沿空留巷围岩变形规律,建立了合理的物理力学模型来计算出巷旁充填体稳定所需要的整体支护强度与可变形能力,并结合现场地质条件与高水材料的特性,最终确定了沿空留巷的合理设计方案,工程实践也获得了成功,最终变"双U"型通风为"Y"型通风方式,基本解决了上隅角瓦斯超限问题,为今后综放沿空留巷提供了一定的实践经验。Based on the deformation law of surrounding rock of the gob-side entry retaining in fully-mechanized coal faces with top-coal caving. The reasonable physical mechanics model is built to calculate the basic support strength and deformation capacity of the filling body beside the roadway, combined with the site geological conditions and the characteristics of the high-water material, the reasonable design scheme of the gob-side entry retaining was determined ultimately. The engineering practice had already achieved succeeded, eventually double "U" type ventilation way was changed into "Y" type ventilation one and the problem of gas overrun in upper comer was settled basically. Those could have certain guidance to the practice experience of the gateway retained along goaf in the future
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28