检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:蒯志要[1] 李楠[1] KUAI Zhi-yao LI Nan(CCCC First Harbor Consultants Co.Ltd., Tianjin 300222,Chin)
机构地区:[1]中交第一航务工程勘察设计院有限公司,天津300222
出 处:《工程建设与设计》2017年第7期47-48,51,共3页Construction & Design for Engineering
摘 要:在建筑工程施工过程中,岩土勘察是非常重要的一个环节,对工程质量有较大的影响。通过对地质情况进行勘察,可以确定地基基础是否适合项目施工,并根据勘察结果及时做出相应的处理措施。论文以实际工程为例,对岩土工程勘测进行了探讨,并对地基处理技术进行了分析。In the construction process of construction, geotechnical investigation is a very important link, the quality of the project has a relatively large impact. Through the geological survey can determine whether the foundation is suitable for construction projects, and in accordance with the survey results in a timely manner to make the appropriate treatment measures. In this paper, taking the actual project as an example, the geotechnical engineering survey is discussed, and the foundation treatment technology is analyzed.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.224.153.49