酒湖工程阀水冷系统设计优化分析  被引量:10

Design Optimization Analysis for Valve Cooling System of JiuHu DC Project

在线阅读下载全文

作  者:刘晓波[1] 许鸿飞[1] 刘源[1] 

机构地区:[1]国网湖南省电力公司检修公司,湖南长沙410004

出  处:《湖南电力》2017年第A01期77-82,共6页Hunan Electric Power

摘  要:分析了韶山换流站以冷却塔为换热设备的水—水冷却系统出现冷却能力不足、换热盘管结垢、长藻等问题,提出了冷却塔冗余配置、喷淋水沉淀物、微生物控制优化方案。分析了酒泉换流站以空冷器为换热设备的水—风冷却系统出现的夏季高温冷却能力不足、热风循环、冬季管道冻裂等问题,提出了辅助冷却、防热风循环、防冻优化设计;通过对两种典型水冷方式的优化分析,提出运维改进措施。This paper analyzes cooling tower5s redundancy design and chemical feeding technology of spray water in order tokeep the cooling capacity of the water cooling system in Shaoshan converter station. It also gives optimizations of Jiuquanconverter station such as assistant cooling and air circulation and antifreeze measures in order to keep cooling capacity of the aircooling system. Through the comparison of these two typical cooling systems, it comes up with improvements of the converterstation’s operation and maintenance.

关 键 词:换流阀 冷却系统 优化分析 

分 类 号:TM46[电气工程—电器] TM402

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象