±800 kV湘潭换流站主接地网施工质量控制及运维建议  

Construction Quality Control and Operation Suggestion of Main Grounding Grid in ±800 kV Xiangtan Converter Station

在线阅读下载全文

作  者:潘劲[1] 刘晓波[1] 常慧鹏 

机构地区:[1]国网湖南省电力公司检修公司,湖南长沙410004

出  处:《湖南电力》2017年第A01期88-90,94,共4页Hunan Electric Power

摘  要:介绍了湘潭换流站主接地网的施工质量控制和技术要求,重点阐述了湘潭换流站主接地网材质选型、焊接质量管理以及施工过程控制,给出了该站主接地网施工过程质量的控制措施,并提出了湘潭换流站后期运维的建议措施,对大型主接地网施工和地网改进有一定的参考价值,为湘潭换流站后续的运行、维护提供重要参考。This paper introduces the construction quality control and technical requirements of main grounding grid in Xiangtanconverter station. It elaborates on the material selection, welding quality control and construction process control of maingrounding grid, provides construction quality control measures, and puts forward suggestions for operation and maintenance ofthe later stage. It has a certain reference value for the construction, improvement and the follow-up operation and maintenanceof the large main grounding grid.

关 键 词:主接地网 施工 质量控制 运维 

分 类 号:TM862[电气工程—高电压与绝缘技术]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象