检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:毕振东 崔宇鹏[2] 夏鹏[2] 张明伟[2] 董山
机构地区:[1]山东省冶金设计院股份有限公司,山东济南250101 [2]山东大学土建与水利学院,山东济南250061
出 处:《山西建筑》2017年第10期77-79,共3页Shanxi Architecture
摘 要:为了研究铁矿未来采空区对高压线路塔基变形影响,采用FLAC3D软件,对铁矿充填开采过程进行了数值模拟,结果表明:因地下开采引起的最大地表位移在矿体两端移动范围边界附近,地表水平变形趋势为两侧向中间移动,在矿体两端移动范围内呈现对称分布,整个开采过程发生的向左、向右水平位移最大值均在20 mm左右,对塔基变形及位移影响甚微。In order to study the impact of future iron mine mined out area upon high-voltage line tower foundation deformation, the paper applies FLAC^3D software, and carries out numerical simulation for the mine mining process. Results show that: maximum ground surface displacement owning to underground mining is within the mine body lateral moving area; surface horizontal displacement trend is from the lateral side to the middle, which is symmetrical distribution within lateral mine moving scope; the maximum value of the left and the right horizontal displacement of the whole mining process is about 20 mm, which has little influence upon the tower foundation deformation and displacement.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.59.90.172