检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:谢友慧[1] 管会生[1] XIE Youhui GUAN Huisheng(School of Mechanical Engineering, Southwest Jiaotong University, Chengdu 610031, Sichuan , China)
机构地区:[1]西南交通大学机械工程学院,四川成都610031
出 处:《隧道建设》2017年第4期462-468,共7页Tunnel Construction
基 金:国家科技支撑计划(2013BAB10B00)
摘 要:以神华新街6°煤矿斜井盾构工程为背景,针对盾构下坡掘进工况,通过建立盾构上作用的水土压力载荷与坡度的数学关系模型,推导出推进阻力与坡度的数学公式。结合工程实例,计算水平掘进与6°下坡掘进各推进阻力值,并利用MATLAB软件绘制下坡掘进时推进阻力随坡度变化的曲线。结果表明:1)6°下坡掘进的总推进阻力相对于水平掘进仅减小了约8%,坡度小于13°时,可通过水平掘进时的推进阻力减去重力沿掘进轴线上的分量来近似求得,且偏差小于10%;2)总推进阻力会随坡角的不断增大而减小;3)当坡度大于50.4°后,盾构有自动向下滑移的趋势,刀盘将自动压紧开挖面,导致刀具自动嵌入开挖面,增加了启动扭矩与换刀的难度。The model of mathematical relationship between water and soil pressure on shield and gradient of slope isestablished; the mathematical relationship between shield thrusting resistance and slope gradient is deduced; the shieldthrusting resistance when boring horizontally and downhill by 6° are calculated; and the curves of relationship betweenshield thrusting resistance and slope gradient are described by software MATLAB, by taking shield-bored inclined shaftof Xinjie Mine in Inner Mongolia for example. The results show that: 1 ) Compared to boring horizontally, the totalthrusting resistance of shield when boring downhill by 6° is 8% smaller. The total thrusting resistance of shield whenboring downhill by 6° nearly equals to that subtracting component of gravity along axial line from total thrusting resistanceof shield boring horizontally when the gradient is less than 13°. 2) The total shield thrusting resistance decreases withthe gradient increase. 3 ) The shield will slide downhill when the gradient is larger than 50.4° ; as a result, the cutterson cutterhead would be invaded into excavation face which would induce hard torque start and cutter replacement.
分 类 号:U45[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3