超长底板水闸混凝土结构温控监测成果分析  被引量:1

Monitoring Result Analysis on Temperature Control of Overlength Base Plate Concrete Stucture

在线阅读下载全文

作  者:魏林坚[1] 刘启波[1] 聂耳清[1] 

机构地区:[1]广东省水利电力勘测设计研究院,广东广州510635

出  处:《广东水利水电》2017年第4期17-20,共4页Guangdong Water Resources and Hydropower

摘  要:从防止混凝土结构温度裂缝考虑,目前国内外建成的绝大部分水闸,闸室底板混凝土结构分段长度均在规范允许的35 m范围之内。龙泉水闸底板最大跨度达到52 m,属于超常规水闸。由于跨度大、对结构变形限制要求高,工程须采用大跨度不分缝水闸底板,且底板为混凝土桩基对结构变形进行约束。因此增加了底板和底板上闸墩墙体结构的防裂难度。针对该问题,工程主要采用水管冷却技术的温控措施,进行温度监测和分析,并取得预期效果。In order to prevent the thermal crack of concrete, the section length of most of sluice boards built in the world at presentis within the allowable range of 35 m. Because the sluice board largest span reached 52 m, Longquan Sluice belongs to ultra -conventional sluice. Due to the huge span and deformation constraint requirement, the project should be used huge span no- cracksluice board, and the bottom of the sluice chamber used concrete pile to support and to prevent deformation constraints. As a result,it greatly increases the difficulty of prevent the thermal crack happened. Aimed at the problem, water pipe cooling technology isadapted to control the temperature in the project; at the same time, temperature monitoring and analysis are conducted to achieve thedesired results.

关 键 词:超长底板 水闸 混凝土 温控 监测 成果分析 

分 类 号:TV66[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象