检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]陕西铁路工程职业技术学院,陕西渭南714000 [2]重庆大学土木工程学院,重庆400044
出 处:《西华大学学报(自然科学版)》2017年第3期108-112,共5页Journal of Xihua University:Natural Science Edition
基 金:陕西省渭南市科研发展计划项目(2015KYJ-3-2)
摘 要:选取阿拉坦隧道浅埋段地表及拱顶上部围岩竖向位移为研究对象,进行实地监测并建立有限元数值计算模型,分析隧道浅埋段围岩变形规律。结果表明:掌子面施工对地表及岩层竖向变形影响范围主要集中在掌子面之前和之后0.5倍洞径(D)范围内,距掌子面1.8 D距离之后,其变形趋于稳定;横向比较各点测试结果得出,围岩松动圈已延伸至地表,离隧道中心线越远扰动强度越弱;数值计算得出岩层及地表变化规律与现场实测变化趋势大体相似。所得结论可为类似隧道工程施工过程变形控制提供借鉴。The vertical displacement of the tunnel vault of Alatan tunnel was selected as the research object. The field monitoring was conducted, and the finite element numerical model was established. Then the deformation law of the shallow buried tunnel sur-rounding rock was analyzed. The results show that the influence of stope face construction on the vertical displacement of vault sur-rounding rock are mainly concentrated within the scope of 0.5D (diameter excavation). The deformation becomes gradually stability at the distances from 1.8 times. The comparison results of the transverse measures points show that the surrounding rock loose circle ex-tends to the surface, and the farther from the center line of the tunnel, the less disturbance intensity. The strata and surface variation law of numerical calculation are consistent with the field measured. The research can provide a reference for the similar tunnel engi-neering construction of process monitoring..
分 类 号:U451.2[建筑科学—桥梁与隧道工程] U456.3[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.198