全站仪和钢尺在建筑工程施工放线中的应用  

Total station and the ruler in the application of steel construction

在线阅读下载全文

作  者:孙玉强[1] 马鑫程[1] 袁兴明[2] 

机构地区:[1]中交公路规划设计院有限公司,北京100088 [2]山东工业职业学院,山东淄博256414

出  处:《山西建筑》2017年第11期206-207,共2页Shanxi Architecture

摘  要:针对不规则建筑物施工轮廓点位放线难度大、耗时、耗力的问题,提出利用全站仪和钢尺联合测量的方法对建筑物施工点位进行放线,并对放线点位的精度作了分析,指出该方法既保证了施工精度,又提高了施工效率,为高层不规则建筑施工测量提供了有效的测量方法。For the construction of buildings irregular contour point actinomycetes difficult, time- consuming, labor-intensive problem, the use of total stations and measuring ruler joint approach to the construction of buildings were put point line, and actinomycetes precision point of doing a- nalysis. Point out this method can not only guarantee the accuracy of construction, improve construction efficiency, and can provide an effective method for the measurement of high-rise building construction survey irregularities.

关 键 词:全站仪 自由设站 极坐标放样 精度 

分 类 号:TU198[建筑科学—建筑理论]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象