检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《净水技术》2017年第A01期166-170,共5页Water Purification Technology
摘 要:平原河网做为城市雨污水的排水通道,由于自身缺乏水动力,水环境恶化速度快。为维持水环境良好,河网需定期引清调水。调水过程流量的大小决定了调水效率和是否会引起河道冲刷,为此,需合理确定引、排水流量。本文以长兴岛河网为例,采用Mike21数学软件建立了长兴岛二维河网模型,对引清调水过程进行水动力计算;同时根据长兴岛河道原状土不冲流速物理模型试验结果,对比流速分布,拟定合适的限制流量。根据计算结果,排水时流量可控制在50~60 m^3/s以内,引水过程流量可控制在50 m^3/s以内,同时,在超过不冲流速的局部河段采取护底或护坡措施。River network in plain areas, as the drainage channels of urban rainwater and sewage, because of lack of water power, the speed of water degradagion is very quickly. The fiver network needs clean water diversion regularly for maintaining good water environment. The discharge determines the diversion efficiency and the channel erosion. As the Changxing Island for example, this article establishes the two-dimensional model using Mike21, calculates the water diversion process. According to undisturbed soil physical model test results, this article campares the non-scouting velocity with the calculating velocity, then formulates the limited disehange. According to the result, the outflow controls within 50-60 m3/s, the inflow controls within 50 m3/s, and the same time, takes the slope protection or bottom protection at the reach that exceeding the non-scouting velocity.
关 键 词:平原河网 引清调水 不冲流速 长兴岛 MIKE21
分 类 号:TV52[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.50