检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:计荣荣[1] 叶海明[1] 单金华[1] 张俭清 吴米佳[1]
机构地区:[1]国网浙江省电力公司检修分公司,杭州311232
出 处:《浙江电力》2017年第2期26-29,42,共5页Zhejiang Electric Power
基 金:浙江省电力公司群众性科技创新项目(5211MB160010)
摘 要:500 kV变电站远动机出现IEC 104通道频繁关闭、重连现象。调度端多次总召唤却出现全零数据、刷屏现象,影响调度正常监控,并导致调度端失去该站监控。分析了该问题产生的具体原因,通过改造装置直流供电回路、优化远动机主CPU插件与NET通信插件互动机制以及完善NSC300与AK1703的通信参数设置等措施有效地解决了该问题。IEC 104 channel of remote terminal unit in 500 kV substation frequently disconnected and recon-nected. With multiple general calling of the dispatching terminal,there occurred all zeroes and screen flood-ing, which affects normal monitoring of dispatchers and substation monitoring absence in the dispatching ter-minal. This paper analyzes the specific reasons and proposes its solution. The problem is solved effectively by DC power supply circuit reconstruction,interaction mechanism optimization between the CPU plug-in and the NET communication plug-in as well as communication parameters improvement of NSC300 and AK1703.
分 类 号:TM63[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28