某工程桩钻芯检测偏出桩体原因分析及处理办法  被引量:5

Cause analysis and treatment measures of deviation from pile during drilling detection of a project

在线阅读下载全文

作  者:黄腾辉 

机构地区:[1]福建省建逸工程检测有限公司,福建泉州362000

出  处:《福建建设科技》2017年第3期15-17,共3页Fujian Construction Science & Technology

摘  要:对某工程冲孔灌注桩进行钻芯法检测时,初次钻取的两个孔疑似偏出桩体,通过对其中一个孔进行测斜,结合地质资料、施工记录、低应变法动测进行分析,重新选定开孔位置,再钻芯对该桩完整性进行分析,最后用静载试验验证。本文案例中对钻芯法试验钻孔偏出桩体情况综合运用多种检测、监测方法分析处理,对工程检测中类似问题具有一定的参考价值和意义。When the drilling core method was carried out at a pile of a project, it was suspected that the first drilled two holes was out of pile body. By measuring one of the holes, combined with analysis of geological data, construction records, low strain dynamic measure- ment, the location of the hole was reselected, and then the core was analyzed. Finally, the static load test was applied to verify. In the case of this paper, the various test methods were used to detect the deviation of hole by drilling core test, it has certain reference value and significance to the similar problems in the engineering testing.

关 键 词:冲孔灌注桩 钻芯法 偏离桩体 测斜 综合处理 

分 类 号:TU753.3[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象