机构地区:[1]中建三局第二建设工程有限责任公司,湖北武汉430073
出 处:《施工技术》2017年第9期11-13,125,共4页Construction Technology
摘 要:超高层建筑中钢结构构件与钢筋冲突碰撞问题发生频繁,而利用BIM的虚拟技术模拟建造后,可以在施工前发现冲突部位,再采取优化钢构件或者钢筋形式、钢筋绑扎顺序等措施,有效解决这一问题。并且将解决措施形成设计文件、施工方案、交底记录等,最终BIM技术落地到现场施工。以武汉绿地中心项目为例,介绍该项目在遇到钢构件与钢筋交叉的复杂节点时,利用BIM技术优化钢筋设计的一系列措施。In super high-rise buildings, the collision of steel structures and steel bars is frequent. After modeling the progress of construction by BIM technology, many collisions can be found before the construction. And then engineers can deal with these problems by optimizing the style of steel structures or the binding order of steel bars construction. All these solutions are concluded in documents such as designing documents, constructing programs and technological descriptions, all of which can ensure the BIM technology to be applied in the site efficiently. This paper introduces how to use BIM technology to solve the problems caused by complex steel structures' joint in Wuhan Greenland Center project.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171