检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王赟
机构地区:[1]中国电建集团中南勘测设计研究院有限公司宜昌设计院,湖北宜昌443002
出 处:《水电与新能源》2017年第5期39-42,共4页Hydropower and New Energy
摘 要:为减少泥沙淤积对库容的影响,古城水电站采用了"正向泄洪冲淤,侧向取水"的布置型式。在首部枢纽闸坝设置了2孔泄洪拉沙闸,进水口前缘设高2.0m的拦沙坎,坎内进水口前布置生态输水管进口,通过生态输水管将进水口前的沉积物排至下游。组成泥沙"拦、排"系统,有效地解决了推移质泥沙进入取水口问题。In order to reduce the influence of the sediment on in Gucheng Hydropower Station, which could be described as the reservoir storage "flood discharging capacity, a specific layout is adopted and sediment flushing in front direc- tion, and water intaking in lateral direction". Two flood discharging and sediment flushing gates are arranged in the head dam. While, a two-meter high sediment barrier is set on the intake front edge. Entrance of an ecological water di- version pipe is then set after the sediment barrier and before the water intake. Thus, the sediment before the water in- take could be flushed downstream through the ecological water diversion pipe. With this sediment barrier and flushing system, the sedimentation problem in the water intake is effectively resolved.
分 类 号:TV732.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.68