检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]贵州省铜仁市水利电力勘测设计院,贵州铜仁554300
出 处:《人民长江》2017年第10期65-68,共4页Yangtze River
摘 要:贵州省德江县新坑水电站双曲拱坝建在不对称"V"形狭谷中,经过圆弧形、抛物线和对数螺旋线双曲拱坝的技术经济比较,最终择优选择了等厚抛物线双曲拱坝。有闸控制溢洪道采用半圆城门拱支撑、闸孔收缩、闸墩等厚呈径向的布置形式,使坝体结构得到全面优化。上述优化使拱坝结构的特点得以充分发挥,溢洪道布置适应地形条件好,工程投资大大降低。对大坝体形选择、体形设计和溢洪道结构设计作了详细叙述,可为在泄流量大、河谷狭窄的地形建设拱坝提供借鉴。Xinkeng double - curved arch dam is located in the asymmetric " V" shaped valley in Dejiang County, Guizhou Province. Through technical and economic selection among the arc, parabola, logarithmic spiral double curvature arch dams, the parabolic doublecurvature arch dam with equal -thickness was adopted. The spillway with gate controlling is characterized as U - shaped gate support, narrowing sluice hole and equal thickness sluice piers with radial collocation. This optimized layout can fully play the arch structure advantage, and gives the spillway a good adaption to the terrain, greatly reducing the engineering investment. We give a detailed description to the dam body shape selection, shape design and spillway structure design, which prorides experiences for building arc dam in narrow river valley with large flood discharge.
分 类 号:TV642.4[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.23.92.150