检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孟俊
机构地区:[1]上海公路桥梁(集团)有限公司,上海市200000
出 处:《城市道桥与防洪》2017年第6期202-204,共3页Urban Roads Bridges & Flood Control
摘 要:上海某盾构隧道工程进洞施工地质和周边环境复杂,施工技术风险高,该工程上下行线地基加固采取了不同的水泥系和冻结法相结合的综合加固方式。针对上下行线分别介绍施工过程中主要技术要点,对过程中发现的问题进行了对比分析,进行了经验总结。The tunneling-in construction geology and the surrounding environment of a shield tunnel project are complicated in Shanghai, and its construction technical risk is high. The different composite reinforcement methods combined with the cement system and freezing method are used to reinforce the subgrades at the uplink and the downlink of this project. Aiming at the uplink and the downlink, the article separately introduces the main technical gist in the construction, compares and analyzes the problems found in the process, and summarizes the experience.
关 键 词:盾构进洞 地基加固 冻结法 水泥系 漏水漏沙 盾构冻结
分 类 号:U455[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.147.103.209