冻结法在某盾构隧道进洞施工中的应用分析  被引量:2

Analysis on Application of Freezing Method in Shield Tunneling-in Construction

在线阅读下载全文

作  者:孟俊 

机构地区:[1]上海公路桥梁(集团)有限公司,上海市200000

出  处:《城市道桥与防洪》2017年第6期202-204,共3页Urban Roads Bridges & Flood Control

摘  要:上海某盾构隧道工程进洞施工地质和周边环境复杂,施工技术风险高,该工程上下行线地基加固采取了不同的水泥系和冻结法相结合的综合加固方式。针对上下行线分别介绍施工过程中主要技术要点,对过程中发现的问题进行了对比分析,进行了经验总结。The tunneling-in construction geology and the surrounding environment of a shield tunnel project are complicated in Shanghai, and its construction technical risk is high. The different composite reinforcement methods combined with the cement system and freezing method are used to reinforce the subgrades at the uplink and the downlink of this project. Aiming at the uplink and the downlink, the article separately introduces the main technical gist in the construction, compares and analyzes the problems found in the process, and summarizes the experience.

关 键 词:盾构进洞 地基加固 冻结法 水泥系 漏水漏沙 盾构冻结 

分 类 号:U455[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象