机构地区:[1]中国电建集团华东勘测设计研究院有限公司,浙江杭州311100
出 处:《水力发电》2017年第6期62-64,共3页Water Power
摘 要:某水电站属高山峡谷地区,由于地形、地质条件复杂,江面宽窄特征不明显,前期移民难度大,施工导流设计的难度较大,采用常规的施工导流方式不能取得满意的效果。结合工程特点,通过采用一次拦断与分期拦断组合导流方式,达到了枢纽布置较优、费用节省、工期短、前期移民难度降低等目的。A hydropower station locates in mountain area. Because of complex topographical and geological conditions, unobvious width characteristic of riverbed at dam site, and difficult early resettlement, the design of construction diversion is more difficult and conventional construction diversion method cannot achieve satisfactory results. Based on the characteristics of project, a new diversion method of first stop and staged block combination diversion is used, which can optimize structure layout, save costs, shorten construction duration and reduce the difficulty of early resettlement.
关 键 词:坝式水电站 施工导流 一次拦断与分期拦断组合导流方式
分 类 号:TV551.16[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222