检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:齐峰[1] 张华一[1] 文福拴[1,2] 孙磊[1] 李梁[3] 毛建伟[3] 李波[3]
机构地区:[1]浙江大学电气工程学院,浙江杭州310027 [2]文莱科技大学电机与电子工程系 [3]国网浙江省电力公司电动汽车服务分公司,浙江杭州310007
出 处:《电力自动化设备》2017年第6期229-235,共7页Electric Power Automation Equipment
基 金:国家重点基础研究发展计划(973计划)资助项目(2013-CB228202);国网浙江省电力公司科研项目(5211DF150007)~~
摘 要:光热发电(CSP)电站具有良好的运行特性,能和电动汽车(EV)充电站联合运行,由此形成的光热充电站具有较好的应用前景。在此背景下,提出了一种CSP电站与EV充电站的集成架构。根据EV车主对充电功率的选择和是否允许EV向电力系统放电,将EV车主细分为激进型、保守型和友好型3种类型,并对不同类型EV的充放电行为进行建模。然后,建立了CSP电站与EV充电站集成系统运行优化的混合整数线性规划模型,以总体运营收益最大为优化目标,并充分考虑了集成系统的发电成本、运维成本、EV采用不同充放电模式的收益以及集成系统各单元之间的功率流约束。最后,采用AMPL/CPLEX求解所建立的优化模型,并通过算例分析说明了所提方法的基本特征。Since CSP(Concentrating Solar Power) station may operate well together with EV(Electric Vehicle) charging station due to its favourable operating performances,an integrated framework of CSP station and EV charging station is proposed. According to their selection of charging power and willingness of discharging from EV to the power system,the friendly,and the charging/discharging EV owners are classified into three types:radical,conservative and behaviour models are built for three EV owner types. A mixed integer linear planning model is then established to optimize the operation of CSP-based EV charging station,which takes the maximum total operational profit of the integrated station as its objective and considers fully the power generation cost,maintenance cost,EV owner's benefits in different charging/discharging modes,and power flow constraints developed optimization method. among units of the integrated station. AMPL/CPLEX model and examples are analyzed to illustrate the basic is applied features of to solve the the proposed method.
关 键 词:配电系统 光热发电 电动汽车 充电站 集成模式 车主意愿 运行策略
分 类 号:TM732[电气工程—电力系统及自动化] U469.72[机械工程—车辆工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28