检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郭文超 王有镗[2] 雷本全 GUO Wenchao WANG Youtang LEI Benquan(Municipal Administration Office of Zibo Urban Planning and Design Institute, Zibo 255000, Shandong, China School of Civil and Architectural Engineering, Shandong University of Technology, Zibo 255049, Shandong, China)
机构地区:[1]淄博市规划设计研究院市政所,山东淄博255000 [2]山东理工大学建筑工程学院,山东淄博255049
出 处:《能源与节能》2017年第6期117-119,共3页Energy and Energy Conservation
基 金:山东省自然科学基金项目(ZR2016DL08)
摘 要:采用度日法对污水源热泵系统的全年能耗及建筑物负荷进行了计算,并与实际测试时的污水源热泵机组的运行性能进行了分析。也对投资方最为关注的经济性做出了初步分析,对工程污水源热泵全年运行的费用指标做出了初步计算。By the method of heating degree days, this paper calculated the annual energy consumption of the sewage-source heat pump system and the building's load, analyzed the performance of the sewage-source heat pump in the actual test and the economy that the investors mostly concerned about, and initially calculated the cost index of engineering sewage-source heat pump through- out a year.
分 类 号:TK11[动力工程及工程热物理—热能工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200