柿花田煤矿掘进工作面瓦斯治理技术探讨  被引量:4

Discussion on Gas Control Technology for Heading Faces in Shihuatian Coal Mine

在线阅读下载全文

作  者:梁运培[1,2] 魏进涛 敖世全 

机构地区:[1]重庆大学煤矿灾害动力学与控制国家重点实验室,重庆400030 [2]重庆大学资源及环境科学学院,重庆400030 [3]贵州官仓矿业开发有限公司,贵州遵义563200

出  处:《煤炭技术》2017年第6期121-123,共3页Coal Technology

基  金:国家重点研发计划项目(2016YFC0801404)

摘  要:为消除11071工作面顺槽掘进过程中的煤与瓦斯突出危险性,采用多种方法进行瓦斯预抽。通过总结对比多种瓦斯预抽措施的消突效果,指出高压水射流割缝技术适用于本矿井复杂地质环境与高瓦斯条件下的突出危险性消除。采用高压水射流割缝后钻孔瓦斯抽采量提高4.4倍,煤巷掘进速度提高50%。Kinds of gas pre-drainage were applied to eliminate the danger of gas and coal outburst when tunnelling the crossheading of working face 11071. Suming up experience and comparing the results, points out that high-presure water jet slotting is applicable for regional outburst prevention as to the coal mine with complex geological structure and high gas condition. Relying on high-pressure water jetting, the quantity of gas drainage have been increased 4.4 times and the speed of tunneling is 50% faster.

关 键 词:低透煤层 高压水射流割缝 煤与瓦斯突出 

分 类 号:TD713[矿业工程—矿井通风与安全]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象