检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周红云 熊德志 ZHOU Hong-yun XIONG De-zhi(Hubei Trading of the Construction Project Group of Companies,Wuhan 430070,China Hubei Trading Western Hubei Construction Group of Companies,Wuhan 430070,China)
机构地区:[1]湖北交投鄂东南建设项目群公司,武汉430070 [2]湖北交投鄂西建设项目群公司,武汉430070
出 处:《建材世界》2017年第3期65-68,共4页The World of Building Materials
摘 要:根据混合梁斜拉桥施工特点,该文提出了分次张拉到位的方法,为悬臂施工时平衡钢箱梁的架设,在钢箱梁悬臂拼装安装斜拉索时进行第一次张拉,初索力值由钢箱梁自重确定,在主跨合拢后桥面系施工前对斜拉索进行二次张拉,第二次张拉索力在初索力基础上采用正装迭代方法确定。The method of tension by several times was put forward according to the characteristic of the hybrid girder cable-stayed bridge. It meant tensioning the cable-stayed for the first time in the stage of consolidating the steel box girder,and the second time after the closure of the main span before the constructing bridge deck system.
分 类 号:U448.27[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.43