混合梁斜拉桥施工索力确定方法研究  

Research of Setting the Cable-stayed Constructing Force for Hybrid Girder Cable-stayed Bridge

在线阅读下载全文

作  者:周红云 熊德志 ZHOU Hong-yun XIONG De-zhi(Hubei Trading of the Construction Project Group of Companies,Wuhan 430070,China Hubei Trading Western Hubei Construction Group of Companies,Wuhan 430070,China)

机构地区:[1]湖北交投鄂东南建设项目群公司,武汉430070 [2]湖北交投鄂西建设项目群公司,武汉430070

出  处:《建材世界》2017年第3期65-68,共4页The World of Building Materials

摘  要:根据混合梁斜拉桥施工特点,该文提出了分次张拉到位的方法,为悬臂施工时平衡钢箱梁的架设,在钢箱梁悬臂拼装安装斜拉索时进行第一次张拉,初索力值由钢箱梁自重确定,在主跨合拢后桥面系施工前对斜拉索进行二次张拉,第二次张拉索力在初索力基础上采用正装迭代方法确定。The method of tension by several times was put forward according to the characteristic of the hybrid girder cable-stayed bridge. It meant tensioning the cable-stayed for the first time in the stage of consolidating the steel box girder,and the second time after the closure of the main span before the constructing bridge deck system.

关 键 词:分次张拉到位法 混合梁斜拉桥 施工索力 钢箱梁 

分 类 号:U448.27[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象