检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李先明
机构地区:[1]中铁城市发展投资集团有限公司,成都610032
出 处:《路基工程》2017年第3期26-30,共5页Subgrade Engineering
基 金:铁道部科技研究计划:哈大高铁运营长期连续观测技术及冻胀整治技术研究(Z2012-062)
摘 要:哈大高铁作为在东北严寒地区建造的第一条无砟轨道高速铁路,对无砟轨道变形有着极为苛刻的要求。水作为路基冻胀的必要条件之一,如何阻止地表水下渗路基本体是控制路基冻胀变形的关键因素,以此为出发点,重点对哈大高铁新型路基与轨道结构缝密封胶的应用研究进行了阐述。The Harbin--Dalian high-speed railway is the first ballastless track high-speed railway built in the severe cold area of Northeast China; it has strict requirement on the deformation of ballastless track. Water is one of the necessary conditions of the subgrade frost-heave deformation; how to prevent the surface water from infiltrating into the subgrade bed is the key factor to control the subgrade frost-heave deformation. Based on such starting point, this paper focuses on elaborating the application of the new type sealant of structural joint on the roadbed and the tracks of Harbin--Dalian high-speed railway.
分 类 号:U214.3[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28