检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张晋波[1] 者永祥 刘浩军[1] 董玮[1] 陈小柯[1]
机构地区:[1]西安高压电器研究院有限责任公司,西安710077
出 处:《高压电器》2017年第6期124-128,共5页High Voltage Apparatus
摘 要:容量试验中短路电流直流分量的大小直接影响电流过零点的di/dt与TRV,对直流分量的精确控制直接关系到试验质量与效率。容量实验室通常控制3台独立的合闸开关分别进行选相合闸以产生满足要求的直流分量。文中运用理论分析方法找出了产生完全对称短路电流和最大非对称短路电流的选相方法,并对一种含有Y/△变压器的回路进行了分析,总结了根据电流波形判断合闸开关关合顺序的方法。The DC component of short-circuit current in high power test affects di/dt and TRV at zero crossing point, and the quality and efficiency of the test depend on accurate control of the DC component. In the high power test, three separate switches are used for phase-selection closing to obtain the required short-circuit current. In this paper, the phase selection methods for respectively generating the fully symmetrical and the maximum asymmetrical short-circuit current are obtained through theory analysis, and the method for setting closing time series according to current waveform is summarized. Besides, a circuit containing Y/△ transformer is analyzed.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15