海洋废弃平台桩基拆除绳锯机多扰动定位夹紧力研究  

Multi Disturbance Locating and Clamping Force Study of Offshore Discarded Platform Piles Removal Wire Saw

在线阅读下载全文

作  者:王海波[1] 张岚[2] 孟庆鑫 王喆[3] WANG Haibo ZHANG Lan MENG Qingxin WANG Zhe(College of Mechanical & Electrical Engineering, Jilin Institute of Chemical Technology, Jilin Jilin 132022, China College of Mechanical and Electrical Engineering, Harbin Engineering University, Harbin Heilongjiang 150001, China Maintainment & Repair Div, Offshore Oil Engineering Co., Ltd.,Tianjin 300451, China)

机构地区:[1]吉林化工学院机电工程学院,吉林吉林132022 [2]哈尔滨工程大学机电工程学院,黑龙江哈尔滨150001 [3]海洋石油工程股份有限公司维修公司,天津300451

出  处:《机床与液压》2017年第11期103-107,共5页Machine Tool & Hydraulics

基  金:国家863高技术研究发展计划资助项目(2002AA6020212-1);国家863高技术研究发展计划资助项目(2006AA09A105-4);中国海洋石油总公司技术发展项目(C/KJFH001-2005);黑龙江省自然科学基金资助项目(E200815)

摘  要:海洋废弃平台桩基拆除绳锯机是一种复杂的机电设备,夹紧力的选择,直接关系到绳锯机的安全稳定工作。分析了桩基夹紧时的截面弯矩和变形量,得到了废弃平台桩基失稳临界力计算方法。利用有限元法分析了桩基夹紧时的变形和受力。采用非线性模型求解出了不同失稳临界力条件下的夹紧瓣夹紧力。实验表明,满足桩基不同失稳临界力条件下,绳锯机夹紧装置的夹紧力能够保证绳锯机安全工作。该结果为绳锯机的水下可靠性工作打下了一定基础。Offshore discarded platform piles removal wire saw is a complex electromechanical equipment, selection of clamping force is directly related to the security and stability of the wire saw. Section bending moment and deformation amount of pile clamping were analyzed, and discard pile platform instability critical load calculation method were derived. Clamped pile deformation and stress were analyzed by using the finite element method ( FEM ) . Clamping forces under different destabilizing critical condition were solved u-sing the nonlinear model. The experiment shows wire saw clamping force can ensure its safety to satisfy pile different destabilizing criti-cal condition. The results lay a certain foundation for the wire saw reliability underwater work.

关 键 词:废弃平台桩基 绳锯机 多扰动 夹紧 

分 类 号:TH123[机械工程—机械设计及理论]

 