桩板墙在临离高速公路陡坡黄土路堤防护中的应用  

Application of Slab-pile Wall in Loess Embankment Protection with Abrupt Slope for Linli Expressway

在线阅读下载全文

作  者:赵建邦 

机构地区:[1]山西省交通规划勘察设计院,太原市030012

出  处:《北方交通》2017年第6期127-130,共4页Northern Communications

摘  要:山西省临县至离石高速公路K70+170~K70+228段路基左侧原设计为衡重式路肩挡土墙,由于现场地面发生较大变化,不具备施做路肩墙条件,需变更设计。经现场重新勘察,对该段采用了桩板式挡土墙方案。桩板墙桩体高根据实际地形采用18m高和9m高两种方案,桩尺寸通过理正计算采用1.0m×1.5m,并在桩顶面以下2m处用锚定板拉接桩体。该处治方案施工后效果良好,可为陡坡黄土路堤防护工程设计提供参考。The original design for the left side of subgrade at the section of K70 + 170 - K70 +228 of Linxian - Lishi Expressway in Shanxi province is a balance - weight - type retaining wall for road shoulder. Due to larger change of site floor, it is not with the condition of being taken as the wall of road shoulder and needs altered design. Through the reinvestigation on the site, the scheme for slab - pile retaining wall is adopted for this section. According to real topography, two schemes like height of 18m and 9m are adopted for the pile body of slab - pile wall, 1.0m ~ 1.5m is adopted for pile dimension by Lizheng calculation, and the pile body is connected by anchor plate at 2m under pile cape surface. After the construction, the treatment scheme is with good effect, thus providing reference for the engineering design of loess embankment protection with abrupt slope.

关 键 词:陡坡路堤 Q2pl黄土 理正计算 配筋 桩板式挡土墙 

分 类 号:U416.12[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象