检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河北工程大学土木工程学院,河北邯郸056038 [2]武汉地铁集团有限公司,湖北武汉43000
出 处:《河北工程大学学报(自然科学版)》2017年第2期62-65,共4页Journal of Hebei University of Engineering:Natural Science Edition
基 金:国家自然科学基金资助项目(71471072)
摘 要:基于先进的BIM5D技术,结合挣值法,深刻挖掘BIM5D技术在成本控制中的潜在优势,系统性地分析成本控制模型的系统实施流程,并通过北京某信息大厦成本控制过程论证了基于BIM5D技术施工阶段成本控制模型构建的可行性。The cost control model can show the change trend of the cost in the construction stage, control costs reasonably, and reduce the cost of construction risk. Based on the advanced BIM5D technology and the earned value method, this paper explores the potential advantages of BIM5D technology deeply in cost control, and analyzes the system implementation process of the cost control model systematically. The feasibility of the construction cost control model based on BIMSD technology is demonstrated through the cost control process of a certain Information Building in Beijing.
分 类 号:TU72[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249