检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李文霞
机构地区:[1]甘肃万泰建设工程有限公司,甘肃兰州730000
出 处:《现代工业经济和信息化》2017年第10期31-32,70,共3页Modern Industrial Economy and Informationization
摘 要:针对项目所用机械设备的耗电较高,能源浪费严重,工程成本提高的现状,论述施工采取更新配电设施,用电设施采用变频设备、对用电设施进行现场合理配置、采用先进的用电装置、通过采用信息化技术控制用电情况等措施以达到项目施工用电开源节能,从而达到降低用电设施成本,提高工程施工总体经济效益的目的。This article is in view of the project of the mechanical equipment used high power consumption, energy waste is serious,the present situation of the engineering costs rise, discusses the construction update distribution facilities, electricity facilities of the electricity facilities by frequency conversion equipment, the reasonable configuration, the use of advanced power device control power, through the adoption of information technology and other measures to achieve open source saving electricity project construction, so as to decrease the cost of electricity facilities, enhance the overall economic benefit of project construction.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.43