检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]大连理工大学建工学部水利工程学院,辽宁大连116024
出 处:《水利与建筑工程学报》2017年第3期31-34,39,共5页Journal of Water Resources and Architectural Engineering
基 金:国家自然科学基金项目(51479022;51179021)
摘 要:导流洞改建为龙抬头式泄洪洞是一种常见的改建形式,其局部水流流态十分复杂。研究一种高水头龙抬头式明流泄洪洞,采用RNG k~ε模型和标准壁面函数模拟紊流,利用几何重构的VOF模型追踪自由水面;对某龙抬头式泄洪洞在设计洪水位闸门全开情况下进行了三维流场数值模拟。将沿程水面高程、底板压力及掺气空腔长度的计算结果与模型试验数据进行对比验证,两者吻合良好,从而为工程设计提供参考。Transforming diversion tunnel to spillway tunnel is common in engineering. A kind of ogee spill way tunnel is studied in this paper,in which the flow field is very complicated. Through simulating turbulence through RNG k ~ ε model and standard wall functions and tracking the free surface through GEO-construct method of VOF model,a 3d flow field numerical simulation for a tunnel spillway was developed under the design flood level. The results of the water surface,bottom pressure and lengths of aeration cavity were compared and analyzed with the model test data which were in good agreement. So the solution data can be used for engineering design.
分 类 号:TV651.3[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.221.240.145