检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孙建新[1] Sun Jianxin(China Railway 19th Bureau Group Co. Ltd. , Beijing 100176, China)
出 处:《铁道建筑技术》2017年第4期74-76,99,共4页Railway Construction Technology
摘 要:在极软岩地层中修建隧道,建造过程中各项风险均很高,若遇到高压富水区施工将寸步难行,严重的将会出现大型突涌及其引起的次生灾害。针对极软岩高压富水区隧道施工,从减压释能理论分析入手,形成了正洞注浆加固、两侧平导减压的减压释能工法。To build a tunnel in ultra soft rock strata will lead to various risks during the construction. Moreover there will be more difficulties if the tunnel is crossing the high-pressure and water-rich area,this could even lead to severe water inrush and secondary disasters caused by the inrush. Based on the pressure and energy relief theory,this paper puts forward the main tunnel grouting reinforcement and lateral horizontal decompression method to deal with the tunnel construction difficulty in high-pressure and water-rich area of ultra soft rock strata.
分 类 号:U455.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15