检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《工程建设与设计》2017年第13期70-72,共3页Construction & Design for Engineering
摘 要:随着城市交通拥堵问题日益严重,修建地下工程和对地下空间进行开发成为了主要的解决办法。早期地铁工程没有纳入城市规划,使地铁修建时其线路经常会从既有建筑物下面穿过,给建筑物基础承载能力造成一定的损伤,通过基础托换能够使这类问题得到较好的解决。论文以狮岭公园人行天桥为例,依据工程地质和水文情况,分析桩基托换设计的原则、结构设计、系统计算等,为类似工程提供参考。With the increasingly serious problem of urban traffic congestion, the construction of underground engineering and the development of underground space has become the main solution. Earlyno subwayproject into the cityplanning, the subway line in the construction often from existing buildings following through, this will give the building foundation beating capacity to cause some damage, the underpinning can make this kind of problem will be solved. The Shiling Park pedestrian bridge as an example, the engineering geological and hydrological conditions are introduced, and then analysis the pile foundation underpinning the design principle, system structure design, calculation, provide a reference for similar projects.
分 类 号:TU753.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.170