一种塔机超长附着架的解决方法  

A Solution to Super Long Attachment of Tower Crane

在线阅读下载全文

作  者:李明 杨威 廖黎明 刘飞 

机构地区:[1]桂林长龙机械有限公司,桂林541100

出  处:《现代制造技术与装备》2017年第6期147-149,共3页Modern Manufacturing Technology and Equipment

摘  要:建筑施工中,塔机超长附着已成为常态。对于超长附着,目前的做法是加长附着杆。但是,附着杆越长,稳定性越差,截面要求越大,且附着杆自重对塔机及楼房附着点反力也越大。因此,探索了一条"刚性拉杆拉结"的新思路,并在广西师范大学育才校区工地实施,效果良好,为自升式塔机超长附着提供了新方法。In building construction, tower crane overlong attachment has become the norm. For the super long attachment, the current approach is to lengthen the attachment rod, and the longer the attachment rod, the worse the stability. The greater the sectional requirements, the greater the counterforce of the attached rod to the tower crane and the building. Our company has explored a new idea of 'rigid tie pull tie'. It has been implemented in the construction site of Yucai campus of Guangxi Normal University. It has a good effect and provides a new method for the overlong adhesion of jack up tower crane.

关 键 词:塔机 附着杆 附着架 

分 类 号:TH213.3[机械工程—机械制造及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象