检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:魏周斌
机构地区:[1]兰州市轨道交通有限公司,甘肃兰州730000
出 处:《山西建筑》2017年第17期150-151,共2页Shanxi Architecture
摘 要:以兰州地铁区间隧道为工程背景,用GTS-NX软件对施工过程进行数值模拟,分析了双孔平行隧道开挖对地表沉降的影响。结果表明:纵向监测点竖向位移分为四个变化阶段,左洞超前右洞15 m时,横向监测点竖向位移分布不是沿两隧道中线呈对称分布,对施工中如何去控制地表沉降具有参考意义。In this paper, the Lanzhou subway tunnel is used as the engineering background, and the GTS-NX software is used to simulate the con-struction process. The two-hole parallel tunnel is analyzed by using the GTS-NX software analyzes influence of excavation on surface subsidence, the results show that the vertical displacement of the longitudinal monitoring points is divided into four stages, when the left hole is advanced by 15 m, the vertical displacement distribution of the transverse monitoring point is not symmetrical along the middle line of the two tunnels. It has reference and guidance to how to control the surface settlement in the construction.
分 类 号:U451[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222