检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]大连理工大学建设工程学部,辽宁省大连市116024
出 处:《水电与抽水蓄能》2017年第3期71-77,共7页Hydropower and Pumped Storage
基 金:十三五国家重点研发计划"复杂工程力学高性能应用软件系统研制"(2016YFB0201000)
摘 要:拱坝横缝在灌浆后保证了坝体的整体性,横缝中的灌浆体具有一定抗拉强度,且球形、梯形键槽对切向滑动的约束与横缝张开度相关。本文在B-可微方程组形式的横缝接触模型基础上,针对法向、切向约束条件进行了修正,提出了考虑横缝初始抗拉强度、键槽切向抗剪力与张开度相关的修正接触模型。数值试验表明,该模型能够模拟拉应力通过横缝在坝块之间传递,以及在横缝张开时,键槽仍能提供较大的切向约束力。The integrity of arch dam can be obtained after the contraction joints are grouted. The mortar in the joints is able to bear the tensile stresses below the tensile strength. Moreover,the constraints of sphere or trapezoidal shear keys in tangential direction will vary with the opening of the joints. In this paper,based on the contact model represented by the B-differential Equations,an updated model is proposed in which the initial tensile strength and relationship between shear strength of shear key and joint opening is taken into consideration. Numerical example shows that the tensile stresses can be transferred between adjacent dam monoliths through joints,and the shear keys can provide large tangential constraints even if the joints open.
分 类 号:TV311[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.63