检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]国家电投集团重庆江口水电有限责任公司,重庆市武隆区408506
出 处:《水电与抽水蓄能》2017年第3期100-104,共5页Hydropower and Pumped Storage
摘 要:江口水电站1号水轮机转轮在运行中产生大量裂纹,为此对转轮进行了改造。为降低转轮制造过程中出现的不平衡量,新转轮在制造厂采用三点称重式静平衡装置进行了静平衡试验。本文详细论述了三点称重式静平衡装置静平衡试验原理及江口水电站1号水轮机转轮静平衡试验过程,通过试验及配重,使转轮的不平衡量小于设计允许值,从而保证了水轮机安全、稳定运行。Cracks were found on the runner of Jiang Kou HPP unit 1 under operation; to solve this problem,modification of the runner was applied to the unit. To minimize the residual unbalance,"3 pivots weighting" balancing method was applied to the runner during manufacturing at the manufacturer. It was detailed described in this paper for the basic principle of "3 pivots weighting" balancing method as well as the routines of the balancing for Jiang Kou U1 new runner. The balancing test reduced the unbalance to meet the allowable design value by means of balancing weight to ensure the turbine unit operating safely and smoothly.
分 类 号:TV74[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.118.155.106