检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄敏[1,2] 唐绍辉[1,2] 黄英华[1,2] 吴亚斌[1,2]
机构地区:[1]长沙矿山研究院有限责任公司,湖南长沙410012 [2]金属矿山安全技术国家重点实验室,湖南长沙410012
出 处:《金属矿山》2017年第7期31-37,共7页Metal Mine
基 金:国家重点基础研究发展计划(973计划)项目(编号:2010CB735507);国家安全生产监督管理总局安全生产重大事故防治关键技术科技项目(编号:hunan-0010-2014AQ);湖南省重大科技专项课题(编号:2011FJ1003)
摘 要:以某水电站为工程背景,采用Autocad与FLAC^(3D)-Extruder地质建模软件建立三维数值分析模型,之后借助专业分析软件FLAC3D对地下厂房硐室开挖及大体积混凝土浇筑全过程进行三维数值模拟计算,主要研究地下厂房硐室开挖及混凝土浇筑全过程中硐室围岩的应力、应变、塑性区变化特征以及锚杆、喷层支护结构的受力特征。研究结果表明:采用分期开挖方式,在施工过程中不会出现异常情况,采用锚喷支护后,硐周的围岩稳定特性较好,锚杆和喷层受力状态较为合理,说明所采用的施工开挖方式和选择的锚喷支护参数是可行的。该研究成果具有一定的指导意义,可为工程管理、开挖支护及监测设计提供参考依据。Taking a hydropower station as the engineering background,three-dimensional numerical analysis model is es-tablished based on autocad and FLAC^(3D)-Extruder geological modeling software,three-dimensional numerical simulation analysisof cavern excavation and whole process of large volume concrete smooth pouring of underground powerhouse is done,so as tostudy the variation characteristics of stress,strain and plastic zone of cavern surrounding rock,and the mechanical characteris-tics of bolt and shotcrete layer structure during the process of cavern excavation and large volume concrete smooth pouring ofunderground powerhouse.The study results show that:any abnormal situations are not appeared during the construction processby using stage excavation method,the stability of cavern surrounding rock is good,the anchor and shotcrete stress state are rea-sonable with the support of shotcrete,which further indicated that the excavation method and parameters of bolting and shot-crete support are feasible.The above study results in this paper can provide some technical reference for engineering manage-ment,excavation supporting and monitoring design.
分 类 号:TD853[矿业工程—金属矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222