检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:鄢镜[1] 黄泰仁[1] 郑惠峰[1] 郎玲芳[1]
机构地区:[1]中国电建集团华东勘测设计研究院有限公司,浙江杭州311122
出 处:《云南水力发电》2017年第B07期21-26,共6页Yunnan Water Power
摘 要:苗尾水电站砾质土心墙堆石坝,工程场地地震基本烈度为VII度,地形地质条件复杂。坝壳料主要采用的溢洪道开挖料,岩性偏软,粒型偏差;心墙砾质土料料源复杂,天然含水率变化大。结合"基础地质条件差、地震烈度高、土料含水率变化大和坝料岩性偏软"等工程特点和难点,从坝基处理设计、坝体结构设计、筑坝材料设计和抗震措施设计等方面进行了大量的专题研究。目前坝体监测成果表明坝体沉降变形、应力应变符合一般规律且数值合理,大坝安全是有保障的。The gravelly soil central core rockfill dam of Miaowei hydropower project is located in a region where the basic seismic intensity is classified as degree Ⅶ and both topographical and geological conditions are complex. The dam shell is mainly composed of the spillway excavations which are characterized by rock being lithologically soft and shape of grain being poor, while the gravelly soil core material borrowed from different areas and its natural moisture content greatly changes. Therefore a lot of special studies have been made on design of dam foundation treatment, design of dam structure, design of dam material and dam earthquake-resistant design according to the engineering characteristics and the key problems of “poor foundation geological conditions, high seismic intensity, changeable moisture content of soil material and lithologically soft dam material”. The dam instrumentation results show that both settlement and stress of the dam body conform to the general law and the values are reasonable so that the dam is proved safe.
分 类 号:TV641.41[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112