检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵维生[1] 梁维[1] 金志远[1] 倪杰[2] 许猛堂[1] 邹川林
机构地区:[1]贵州理工学院矿业工程学院,贵州贵阳550003 [2]皖北煤电集团祁东煤矿,安徽淮北234001
出 处:《煤矿安全》2017年第7期40-43,48,共5页Safety in Coal Mines
基 金:贵州省科学技术厅科学技术联合基金资助项目(贵科合LH字[2016]7107);贵州省教育厅青年科技人才成长资助项目(黔教合KY字[2016]227;[2015]427)
摘 要:针对某矿遗留煤柱下伏近距煤层巷道围岩变形大、不易控制等难题,采用数值分析方法,结合现场工业性试验,研究了遗留煤柱下伏煤岩体的强度系数和应力影响规律,优化了该矿巷道布置方式。研究结果表明:上覆煤层采完后,形成了以遗留煤柱为中心的五边形围岩强度极低区和半圆强度极低区,在进行巷道位置选取时,须避开该区域以保证围岩的稳定。For the problem that it is hard to control the large deformation of roadway surrounding rock which underlies residual coal pillar of close coal seam in a coal mine, strength coefficient and stress influence laws of coal seam underlying coal pillar are studied by the numerical analysis method, and combined with the industrial test, the arrangement of roadway has been optimized.The results show that after the mining of overlying coal seam, the extremely low area of surrounding rock, like a pentagon and taking the residual coal pillar as the center, is formed, as well as an area like semicircle is formed. Therefore, to ensure the stability of surrounding rock, when the layout of roadway is designed under this conditions, these areas should be avoided.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117