柳林县黄河提水工程水源地取水方案评价  

Assessment on Water Extraction Scheme from Water Resource Field for Liulin Yellow River Pumping Project

在线阅读下载全文

作  者:尹晋忠[1] 

机构地区:[1]山西省水利水电勘测设计研究院,山西太原030024

出  处:《山西水利科技》2017年第3期48-50,共3页Shanxi Hydrotechnics

摘  要:文中在大量现场勘察、水文地质试验资料的基础上,通过对工程区地质条件的分析,采用多种方法对水文地质参数和大口井涌水量以及大口井取水方案的可行性进行了评价,进而确定了柳林县黄河提水工程水源取水方案,为工程设计和运行提供地质依据。On the basis of a large quantity of data obtained from on-the-scene exploration and hydrogeology tests,through analysis on the engineering geology condition of the project,and using several methods,the paper determines the project's hydrogeology parameters,calculates the water yield of large open wells,assesses the feasibility of water extraction scheme by using large open well. At last,the water extraction scheme of Liulin Yellow River Pumping Project is determined,and the geology basis for this project's design and operation is provided.

关 键 词:黄河 提水 抽水试验 大口井 出水量 

分 类 号:TV671[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象